New-build handover on the Costa del Sol: a snagging checklist
Arrange an inspection, make a bilingual snag list, and check which documents, keys and access devices should come with a first-sale home.

Ask the developer for a snagging visit before you sign the public deed or collect the keys, ideally with time to revisit. Snagging means checking the finished home for defects and differences from what you agreed to buy. If you live abroad, arrange access for an independent building professional and ask your Spanish lawyer to confirm the inspection and repair process before you book your flights.
Arrange access to the home you actually bought
Ask the developer to confirm the block, floor and apartment number, along with the garage bay and storage room if those are included. Ask how long you will have inside and which utilities will be working. Bring the signed floor plan, the memoria de calidades (the agreed specification of materials and finishes) and any written changes you approved. Take the documents that identify your unit, as showroom layouts and finishes may vary.
If water, power or building systems are unavailable for testing, write down exactly which checks need a return visit. Arrange that visit before leaving Spain, or agree who can attend for you. If access is limited or the home has signs of damp, recurring leaks or other issues you cannot diagnose, ask an independent building professional to inspect and report on them.
Walk the apartment in the same order every time
Start at the front door and work through each room. Check the places that affect how you will use the home from day one. Keep any testing to ordinary operation and ask the site representative to demonstrate systems you are unfamiliar with.
- Open, close and lock doors, windows and terrace sliders. Check handles, shutters and visible seals where fitted.
- With permission and working utilities, run taps and showers, flush toilets, and look under basins for leaks. Check hot water and ask for a demonstration of ventilation and climate controls.
- Look across floors and walls in daylight when possible. Check for chipped tiles, damaged glass, loose fittings and doors or drawers that catch.
- On the terrace, look for blocked outlets and signs of standing water. Ask how drainage can be checked safely. Walk the route to your numbered parking bay or storeroom and test the access devices when available.
Turn each defect into something the repair team can find
Give each item a number, room and exact location. Take a wide photo to orient the repair team and a close photo of the issue. Add a short Spanish description where you can. For example, “07 · Bathroom 2 · Water pools outside the shower screen after use / Se acumula agua fuera de la mampara después de usar la ducha.” Add the date and record what you observed. Let a qualified inspector assess the cause where it is unclear.
Send the list to the developer’s named after-sales contact and ask for written acknowledgement, an expected repair date and a way to confirm the work. Ask your lawyer how outstanding issues should be recorded and handled before you sign the escritura pública de compraventa, the public deed of sale. At the follow-up, mark repairs as verified only once someone has checked them.
Check the paperwork and the dates that matter
For a completed home on first sale in Andalusia, request the Documento Informativo Abreviado (DIA), the buyer information sheet. It includes the date the developer accepted the works and information on the administrative approvals or equivalent acts for use or occupation. Ask your lawyer to verify the applicable occupation documentation for your apartment, its associated spaces and the common areas. Request access to the Libro del Edificio, the building file that includes instructions for use and maintenance.
Spain’s Building Act distinguishes responsibility periods for defined categories of construction damage. Article 17 sets one year for the builder’s liability for specified finishing defects, three years for defects affecting habitability and ten years for specified structural defects that directly compromise strength or stability. The periods run from formal acceptance of the works without reservations or from correction of those reservations. Ask your lawyer for the documented date for your phase and how to notify any defect promptly.
Leave with a record of what was handed over
Before you leave, count the keys and access devices for the apartment, building, garage, storage room and mailbox as applicable. Collect available operating instructions, after-sales contacts and any meter identifiers needed to set up services. Keep the dated snag list, photographs and acknowledgement together so you can follow up from abroad.
Your next step is to email the developer for the inspection date, confirmed access and the documents for your specific home. If your visit will be short, give your lawyer and inspector the dates before you book travel, and agree who will verify any repairs after you leave.