Buying a new build in phases: when can you use the shared facilities?
Match your apartment’s handover date to the delivery of shared facilities, access routes and operating arrangements before planning your first stay.

Before reserving a home in a development built in phases, ask your lawyer to check the delivery dates for your apartment and the shared facilities you expect to use. Put the pool, gardens, parking access and any indoor amenities on their own lines. Then check what must happen before each can open to residents, so your first stay reflects the documented plan for your phase.
Start with a plan of your phase
Save the apartment’s block, unit number and phase alongside a dated plan of the development. Mark the shared facilities you would use and the routes to them. Ask which parts belong to the phase being delivered with your home and which sit within later works.
In Andalusia, the Documento Informativo Abreviado, or DIA, is the buyer information sheet. Article 6 of Decree 218/2005 requires information about common areas and accessory services, as well as delivery dates for the home, its associated spaces and common elements. Ask your lawyer to reconcile the DIA with the contract and the plan for your particular unit.
Give each facility its own entry
Create a short schedule for the facilities that matter to you. For each, record the description agreed for your purchase, the delivery date, the planned opening date and the document supporting the answer. Include the access route if reaching a facility depends on another part of the site.
Use ordinary activities to make the questions specific. If you want to swim before breakfast, check the route from your block to the pool. If you plan to work in a shared workspace, ask when the room and its required services will be ready. Include lifts, pedestrian gates and garage access where they affect your daily route.
Ask who will confirm operational readiness and give residents their access instructions. Where an answer is provisional, record that status and the date for the next update. Keep the written answers with your purchase documents.
Keep the different handover records clear
The Spanish Building Act allows the builder’s formal handover to the developer to cover the entire works or complete, finished phases when the parties agree. That act is called recepción de la obra. Ask your lawyer which completed phase the relevant records describe.
For a completed new build on first sale, the Andalusian DIA also addresses the administrative licences or equivalent acts needed for use or occupation of the home, associated spaces, common areas and services. Have the lawyer check the documentation for what you are buying and the facilities you have been promised.
Save dated brochures and any written changes to the delivery arrangements. Royal Decree 515/1989 gives significance to advertised characteristics and requires clear delivery information where the home, common areas or accessory elements are unfinished. Ask your lawyer to resolve any conflicting dates before you commit.
Try your intended first stay against the dates
Consider a fictional example. An apartment in Phase A is scheduled for handover in June 2028, while a shared pool appears on a separate schedule for September 2028. You hope to stay for two weeks in July. Those assumed dates show why you need to check both schedules before making swimming part of the July plan.
Take the example one step further with your own documents. List what would be available during your intended stay, what still needs confirmation and what later works could affect the surroundings. Ask about the route from your entrance to the public street, the location of construction access and how residents will receive updates.
Use the same approach if a facility is physically finished but operating arrangements are still being prepared. Ask for confirmation of the intended opening date and the remaining steps. Check any changed plan with your lawyer before agreeing to it.
Prepare a short completion checklist
Near completion, review the latest schedule with your lawyer and arrange for the applicable shared spaces and access routes to be checked during an authorised inspection. Record outstanding points, who will respond and when another check is expected. The NAVEN pool cover is an architectural rendering credited to Nuovit Homes. The example dates in this guide are fictional.
- Match the apartment, block and phase across the contract, DIA and dated plans.
- Record the delivery and opening arrangements for the facilities important to your first stay.
- Have your lawyer verify the relevant completion and occupation documents.
- Keep the contact and process for reporting outstanding shared-area issues.
Make the first request easy to answer
Your next step is to give your lawyer the list of facilities you expect to use during your first stay. Ask for a written check of their delivery dates, the relevant contract wording and any unanswered opening or access questions. You can then plan travel and handover around the information confirmed for your home.