Fuengirola · The NAVEN neighbourhood

A new home for sport in Los Boliches

A few streets from NAVEN, Fuengirola is rebuilding the Santa Fe stadium. The football pitch will return, joined by three indoor sports halls and a public rooftop pool. Here’s what the council has approved and where you can see the site for yourself.

Reviewed

Aerial rendering of the proposed courthouse in front of the Santa Fe football pitch
The architects’ daytime view shows the new football pitch just behind the courthouse.
Town council contract
€48.77 million
Planned public parking
1,070 spaces
From NAVEN, in a straight line
About 490 m

What’s planned for Santa Fe?

The project brings sport and public services together on Avenida de las Salinas, on the site of the former Santa Fe–Antonio Basilio stadium. The completed complex is expected to cover around 14,500 m².

Football, volleyball and roller hockey

The new football pitch will have its own stand. Next to it, the plans show dedicated halls for volleyball and roller hockey, plus a third hall that can be set up for basketball and other sports.

A public pool on the roof

Alberro Arquitectos have designed an outdoor leisure pool with 312.5 m² of water on the roof of the sports complex. It forms part of the town’s public facilities. NAVEN has its own residents’ pools and spa.

Public parking and a new courthouse

Three underground levels will provide 1,070 public parking spaces. The council says the car park could open ahead of the rest of the complex. The new courthouse will have a separate entrance.

Read the council’s account of the design (in Spanish)

What has happened on site?

The €48,766,872 contract covers design and construction. The council allowed 29 months for building work. Its published updates give no fixed opening date for the facilities.

  1. The town council announced the contract award, with three months for technical design. Contract announcement
  2. Work began with demolition of the old Santa Fe stadium. Start-of-works announcement
  3. The council reported that the main entrance, the stand and one sports hall had been taken down. Excavation for the underground car park was the next step it identified. Update from the site

See how the stadium meets the street at dusk, then step inside the sports halls and up to the rooftop pool. Select any image to enlarge it and browse all five views.

Walk it from NAVEN

The stadium site is about 490 metres south-west of NAVEN in a straight line. The walk follows the streets of Los Boliches, and access may change as work progresses.

Distance measured from the developer’s location for NAVEN to the stadium coordinates in the council tender (page 67).

From the NAVEN site to the seafront

Join Tom Zymrus on a filmed walk through the neighbourhood. The first chapter shows the NAVEN site. The second takes you to Los Boliches beach and its promenade. The commentary is in Czech.

Explore Los Boliches with us

On a viewing with our team, walk from the NAVEN site to Santa Fe, then head down to the seafront. It’s a chance to see how the streets, the beach and the proposed sports facilities fit into daily life here.

Santa Fe architectural designs